Installation

Installing The System

Installation of the 2Fuel system on existing engine applications is a simple turn key process which can be completed by our Dealers or your own Fleet Service Center.

No internal engine modifications are required and all components are conveniently mounted and plugged into the wiring harness and air intake.

Fully trained technicians can install the 2Fuel Dual Fuel Under Hood Conversion Kit within one day. (Does not include Tank installation).

 

CNG Injection Installation

Commissioning and Diagnostic Communication

Factory provided diagnostic software is installed on a standard laptop computer and communicates with the ECU via a communication cable plugged into a spare USB port.

After the installation, the diagnostic software is used to fine tune the initial ECU parameters and fueling maps during commissioning.

The same commissioning software is used for service diagnostics and application adjustments.

 

CNG Injection Installation

How Much Can You Save with 2Fuel?

2Fuel delivers 60% more “End of Day Diesel Fuel Displacement” than any other Dual Fuel System.

2Fuel is the only Dual Fuel System that continues to blend fuels, throughout the complete high load cycle,
and maintains the original diesel engine specified OEM Torque and HP.


Mobile Off-road

Mobile Off-road Equipment

Excavating and hauling equipment running 12 hours per day would consume a minimum of 52,000 gallons of diesel fuel
per year.

Fuel Savings Calculator

Stationary Engines

Stationary Engines

The larger stationary engines running 12 hours per day would consume a minimum of 52,000 gallons of diesel fuel
per year.

Fuel Savings Calculator